
Agents for every part of the plant.
Stamped models your processes and equipment from the data you already log, then its agents find the change that cuts the loss in process, quality and planning, inside limits set beforehand. Maintenance is coming next.
Run every process closer to its best.
Stamped learns how each machine in your process behaves from the data you already log and tries the next setting on a model before the line sees it. Once a change has proved itself, Stamped applies it on its own, inside limits set beforehand.
Catch the bad batch while it can still be saved.
Stamped watches every run against what good parts looked like and warns your team while the batch can still be fixed. When a reject does happen, it traces it back to its cause with the record behind it.
Plan around how your plant really runs.
Plans break in almost every shift, because a changeover ran long or material arrived late. Stamped reads what each line is actually doing and warns your planner when the plan is about to slip, with a better order of work ready to accept.
Know which machine is starting to wear before it stops.
We are building this next. Stamped will watch how each machine behaves from run to run and tell your team when one starts to drift, while there is still time to plan the fix around production.
Energy follows every operating decision.
A reheat or an hour of a furnace sitting hot and empty uses energy that never ends up in a good part. Because most of the saving comes from running the plant better, Stamped counts energy inside every action described above and measures it against your own baseline, with tariff windows and demand peaks treated as one input among many. On the utilities side it looks at compressors, air, steam and cooling, and moves load away from demand peaks where the plan allows. Less energy in every good part is also the most practical step toward decarbonisation, and for plants electrifying process heat, Stamped counts electricity per good part the same way.
- ExampleFor the shift lead
Furnace 2 has been idle and hot for [N] hours with no load due before the shift change, so it can be set back now.
- ExampleFor the electrical lead
Three furnaces and the compressors are due to start together, so starting Furnace 3 a little later keeps the demand peak down without moving any charge.
- ExampleFor maintenance
The air leak on Line B is worth inspecting now, and the card closes once the feeder draw drops.
Illustrative. Written from the kind of records a plant already keeps, with no real figures.
What owners usually ask us first.
- What does it cost?
- Only the pilot price is agreed at the survey. The pilot is paid and priced on its own, and the annual price comes after, based on the pilot's results.
- What do we need to install?
- Nothing new to start. Stamped connects to the machines, meters, ERP and registers you already have, and the survey tells you plainly if that is enough.
- How much of my team's time?
- Some hours with your plant head and your quality and maintenance leads during the survey, planned around production. In the pilot, actions reach the people who already own that work.
- Is our data safe?
- We sign an NDA before the survey, and we work only with the data your team agrees to share.