Plan around how your plant really runs.
Plans break in almost every shift, because a changeover ran long or material arrived late. Stamped reads what each line is actually doing and warns your planner when the plan is about to slip, with a better order of work ready to accept.
What Stamped's agents do here
Sample finding · Planning · A plan that broke
A line has stopped. The rest of the shift can still be saved.
- What we found
- The stop leaves jobs waiting on one line while another line has room.
- The opportunity
- Moved now, today's dispatches can still leave on time.
- How we capture it
- Your planner sees the new order and accepts it. Promise dates and customer priority stay with your planner.
Monitoring
- Knows what each line is really doingRunning, stopped and changeover time is read from the records each line already writes.
- Warns when the plan is about to slipWhen a machine runs slower than the plan assumes, your planner hears while the shift can still be saved.
Decision making
- Re-plans after a stopWhen a line goes down, a workable order for the rest of the shift is ready to accept.
- Groups similar workJobs that share a setting or a clean-down are put back to back, so less time goes to set-ups.
- Writes the shift handoverWhat changed this shift is written up for the next one.
- Answers where an order isAsk where an order is and when it will ship, and the answer comes from your plant's own records.
Promise dates, customer priority and dispatch order stay with your planner.
What the people who own the problem receive
- For the planner
Line 2 is down. A workable sequence for the rest of the shift is ready for you to accept.
- For the planner
Running these two allergen-free batches back to back saves one full wash-down this shift.
- For the planner
Tomorrow's forecast load leaves room to run the long job on the night shift.
- For the production lead
Run these lots back to back by temperature this shift, so the furnace does not heat up and cool down between them.
Illustrative. Written from the kind of records a plant already keeps, with no real figures.
How Stamped re-plans
Stamped keeps a picture of the plant from the records it already writes: which machines are running, down or waiting, what material is on hand, which dispatches are due and when maintenance is booked. When something changes, it compares workable orders of work against those constraints and ranks them. Changes to dispatch order and promise dates stay with your planner.
- 01
Track
The state of machines, material and dispatch, read from your own records.
- 02
Compare
Workable orders of work are scored for output and delivery, with energy counted in both.
- 03
Choose
The planner picks, with the trade-offs of each option in front of them.
Energy follows every operating decision.
A reheat or an hour of a furnace sitting hot and empty uses energy that never ends up in a good part. Because most of the saving comes from running the plant better, Stamped counts energy inside every action described above and measures it against your own baseline, with tariff windows and demand peaks treated as one input among many. On the utilities side it looks at compressors, air, steam and cooling, and moves load away from demand peaks where the plan allows. Less energy in every good part is also the most practical step toward decarbonisation, and for plants electrifying process heat, Stamped counts electricity per good part the same way.
In planning: Grouping similar work, filling loads and timing heat-up to the moment the next job is ready keep machines from running hot and empty, and tariff windows are weighed as one input to the plan.
Also across the plant
Questions about planning
What does Stamped do when the production plan breaks?
When something changes, such as a changeover running long, a machine tripping or material arriving late, Stamped proposes the order of work that suits the plant as a whole and shows what each option would do to output and delivery.
What does Stamped keep track of to re-plan?
Which machines are running, down or waiting, what material is on hand, which dispatches are due and when maintenance is booked.
Who makes the final scheduling decision?
The planner. Stamped ranks the options with the trade-offs of each in front of them, and promise dates, customer priority and dispatch order stay with the planner.
How does planning affect energy use?
Grouping similar work, filling loads and timing heat-up to the moment the next job is ready keep machines from running hot and empty, and tariff windows are weighed as one input to the plan.
What owners usually ask us first.
- What does it cost?
- Only the pilot price is agreed at the survey. The pilot is paid and priced on its own, and the annual price comes after, based on the pilot's results.
- What do we need to install?
- Nothing new to start. Stamped connects to the machines, meters, ERP and registers you already have, and the survey tells you plainly if that is enough.
- How much of my team's time?
- Some hours with your plant head and your quality and maintenance leads during the survey, planned around production. In the pilot, actions reach the people who already own that work.
- Is our data safe?
- We sign an NDA before the survey, and we work only with the data your team agrees to share.